From full design through to installation and commissioning

With ongoing planned maintenance and reactive support for a local school in Felixstowe.

Olympus Mechanical Services delivered the complete plant room design and boiler replacement for Grange Primary School, from an emergency hot water response through specification, installation and commissioning.

Restoring hot water within one day

Grange Primary School called Olympus Mechanical Services after the boiler serving its hot water system failed and could not be repaired. The school needed an immediate solution while a permanent replacement could be designed and scheduled.

Olympus supplied, installed and connected a temporary boiler room within one day of the hot water loss. The temporary plant kept the school operating until the permanent work could take place during the summer holiday.

Engineer installing pipework and valves during the Grange Primary School boiler room replacement

Planning the permanent replacement

The existing plant room required asbestos removal before the main installation could begin. Olympus coordinated the survey and removal work, managed the full plant room design and specification for the trust, and planned the changeover around the school calendar.

During the six-week summer break, the team removed the temporary arrangement, installed the new hot water generation plant and restored hot water before pupils returned. The wider heating work was completed in time for the planned October heating period.

Full plant room design for the trust

The customer’s brief was clear: “complete a full plantroom design for the trust”. Olympus Mechanical Services managed the design of the whole project, developing the plant room layout, heating and hot water schematic, equipment schedules and coordinated service connections.

The heating and domestic hot water schematic brings together the twin-boiler arrangement, plate heat exchanger, low-loss header and separate heating and calorifier circuits. It sets out the circulation pump duties, pressurisation, expansion, air and dirt separation, together with the valves, sensors and commissioning points that connect the system.

By designing these elements together, Olympus connected the new boiler plant to the school’s existing systems and carried the design through into installation and commissioning.

Heating and hot water schematic showing the twin boilers, plate heat exchanger, low-loss header, circulation pumps and calorifier with plant schedules

Heating and hot water schematic with plant schedules, showing how the boilers, hydraulic separation, circulation pumps and calorifier connect to the school’s systems.

A complete boiler room refit

School plant room specification drawing showing equipment positions, pipework routes, flue and service connections for the boiler room replacement

Plant room layout and installation details.

Olympus designed the boiler room as a complete heating and domestic hot water system, coordinating the boilers, hydraulic connections, circulation pumps, stored hot water and controls.

The boiler schedule specifies two Remeha Quinta Ace 115 gas-fired condensing boilers, each with a scheduled maximum output of 103.9 kW, giving 207.8 kW combined. The design also shows a packaged boiler skid with integral circulation, pressurisation, expansion and a plate heat exchanger.

For hot water, the design specifies a Hamworthy Powerstock PS400 calorifier with 382 litres of storage and a 76.2 kW heat input with both coils connected. The hot water cylinder also provides immersion-heater backup when the boilers are unavailable.

Two circulation pumps connected to copper pipework in the school boiler room
Pressure gauges fitted to pipework in the Grange Primary School boiler room
Close-up of a temperature gauge in the school hot water system

Technical specification: plant and equipment

The project drawings set out the main plant and supporting components:

  • Boilers: two Remeha Quinta Ace 115 units, each scheduled at 103.9 kW maximum output.
  • Hot water storage: a Hamworthy Powerstock PS400 calorifier with 382-litre storage, an unvented kit and both heating coils connected.
  • Circulation: Grundfos MAGNA1 D 65-150 F, 32-120 F and 40-150 F twin-head pump sets, plus two MAGNA1 25-60 N hot water return circulators.
  • Pressurisation and expansion: a Mikrofill EFD unit, 200-litre expansion vessel and quick-fill loop.
  • System water quality: a Spirotech SpiroCombi DN80 air and dirt separator, dosing pot and inline scale reduction.

Pipework, insulation and commissioning

The design notes specify heavy-grade carbon steel heating pipework to BS EN 10255 and R250 copper hot and cold water pipework with Yorkshire XPress press-fit fittings.

The insulation specification includes 50 mm mineral fibre sections from ROCKWOOL, foil-faced finishes and removable insulation for valves and flanges. Automatic air vents, low-point drains, strainers, commissioning sets and temperature and pressure gauges are also shown.

The notes call for the completed system to be flushed and treated with an appropriate inhibitor. These details form part of the design’s provision for commissioning and ongoing maintenance.

Integration with the existing building

The hydraulic design connects the new plant to the school’s existing heating and hot water services. The drawings show 80 mm primary flow and return connections from the plate heat exchanger, a 100 mm low-loss header and a 65 mm variable-temperature heating circuit.

The plate heat exchanger transfers heat while separating the boiler water circuit from the existing system. Dedicated circulation pumps serve the heating, calorifier and hot water return circuits. The layout also coordinates the gas supply, flue connections, condensate drainage and building management system (BMS) controls.

Isolation valves fitted to vertical pipework in the school boiler room
Close-up of a copper pipe fitting during the boiler room installation

One team managing the complete project

Olympus managed the work from the first emergency call through temporary plant, survey coordination, full plant room design, specification, installation and commissioning. The complete project took eight weeks from planning to final delivery.

The coordinated scope covered mechanical installation, electrical services, BMS controls, flues, asbestos coordination, access arrangements and insulation. Olympus managed how these elements came together in the finished plant room.

Temporary plant

Design & specification

Installation

Commissioning

Planned maintenance and reactive support

The project continues beyond installation and commissioning with ongoing planned maintenance and reactive support for the school. Olympus’s knowledge of the plant room design, equipment and controls carries through into the care of the completed system.

This gives the trust continuity from the original design through routine servicing and support when faults occur.

Project partners

LinkOptimum Controls for electrical work and building management system controls.

LinkDAB Scaffolding for access support.

LinkIpswich Insulations for asbestos work.

LinkGill Insulation for insulation work.

Flue contractor MBA Flue Services Ltd

The result

The school received an immediate temporary hot water solution and a fully designed permanent plant room, delivered around the holiday period. Olympus brought together the mechanical design, equipment specification, installation and commissioning, with ongoing planned maintenance and reactive support.